LOCATION:
OPERATOR:
DURATION:
CLIENT:
SCOPE:
COATZACOALCOS, VERACRUZ; MÉXICO.
PRO-AGROINDUSTRIA
MAY 2017 - FEBRUARY 2019.
GRUPO AVANZIA.
CIVIL, ELECTRICAL, COMMISSIONING.
KMEISA initially entered into a contract with Grupo Avanzia for the execution of the Main Civil Works associated with their Fertilizer Plant Refurbishment Project, the scope of work awarded included all material supply, installation and manpower associated with the execution of:
• New Major Equipment Foundations.
• All Access Roads and Plant Drainage
• Rehabilitation of Existing Foundations and Existing Equipment Bases.
KMEISA were later awarded the Electrical Construction Works contract onthe same project, the scope of works included:
• Cable Laying.
• Cable Tray and Conduit Installation.
• MV and LV Cable Terminations.
• Switchgear Installation.
• Plant Lighting Systems.
• Grounding System.
In October 2017, due to the success of the aforementioned works, KMEISA were awarded the multidiscipline Commissioning Works, including Manpower and Equipment supply
The scope of works included Loop Checking, Mechanical Equipment Alignment, Electrical Equipment and Instrumentation Commissioning and System Checking.
During the peak commissioning period some 160 skilled technicians were employed.
Overall our execution utilized 2,5000,000 LTI free manhours which strengthens our safety records.